Velocity History for Jira
Velocity History shows committed versus completed velocity for the closed sprints on a Jira Software board. It lives on a project page, not on a dashboard. You can show 3 to 52 closed sprints (12 by default). A short panel explains how the figures are counted.
The app does not write to your work items, sprints or boards.
Install
- Install Velocity History for Jira from the Atlassian Marketplace.
- A Jira administrator accepts the app's permissions.
- Open a Jira Software project. The Velocity History tab is in the project navigation. If the project already has many tabs, Jira may place it under More.
The page is shown only on software projects. It lists the project's scrum boards and team-managed boards (board type simple). It does not list kanban boards. If the project has no scrum or team-managed board, the page says: "This project has no scrum board. Velocity History needs a board with sprints."
If the license is not active, the page says: "Velocity History: the license is not active. Ask your Jira admin to check the app license."
The project page
If the project has more than one board, a board picker is shown. The first board, or the board from the project page context when Jira provides one, is selected. The picker does not remember the selected board after a reload; the number of sprints you chose does.
Choose:
- Sprints: a whole number from 3 to 52. The default is 12, so the first view is easy to compare with Jira's Velocity Chart. The number last chosen on the page is remembered for that board and used after a reload. It is shared by everyone who opens the board, not stored per person. When a project or Jira admin saves settings, that stored number is cleared and the default from settings is used instead.
- Statistic: the board's estimation field (for example story points), or work item count. If the board has no estimation field, the page counts work items and says so. Original time estimate is shown in hours.
- Rolling window: 2 to 6 sprints, default 3. This is the window for the rolling average.
- Exclude sprints with 0 completed: when selected, sprints with nothing completed are left out of the averages.
The chart shows committed versus completed per sprint. The table has the sprint name, dates, committed, completed, completed / committed, a Captured or Reconstructed badge, and a report link.
The first time a board is opened, or when you ask for more sprints than have been built, the page may say: "Building history. This can take a few minutes the first time." It then shows progress as "Building history: x of y sprints". You can keep the page open while it runs.
Recalculate rebuilds the stored figures for the board. If it was used a moment ago, the app says: "Recalculate was used a moment ago. Try again in a few minutes."
Report links
- On a company-managed scrum board, Sprint report opens Jira's sprint report for that sprint.
- On a team-managed board, Open burndown report opens Jira's burndown report for the board. Jira does not apply a sprint parameter on that report, so you pick the sprint there.
How this is calculated
Open How this is calculated on the page. The text comes from the app and includes:
- Committed is the total estimate of the work items that were in the sprint when it started. Items added later, and estimate changes after the start, are not included.
- Completed is the total estimate of the work items in the sprint when it ended whose status counted as done. It includes work added after the start.
- The average is the mean of completed over the sprints shown. Sub-tasks are not counted. Each work item counts once per sprint.
- Closed sprints without any work items are left out, as in Jira's Velocity Chart.
- Work items in a status that is not mapped to any board column are not counted.
- Totals are calculated by the app and can include work items you cannot open.
- The done rule in use: by default, a work item counts as done when its status category is Done. If statuses have been chosen in the board's settings, those statuses are used instead.
- The estimate in use: the board's estimation field, original time estimate in hours, or work item count.
- How many of the shown sprints are Captured and how many are Reconstructed.
Jira's own Velocity Chart counts a work item as done when its status is in the board's last column. If a status is in the Done category but not in that column, the default rule in this app can count it as completed when Jira's chart does not. In settings, choose the statuses from the board's last column if you want the figures to follow that column.
Reconstructed versus Captured
Each calculated sprint in the table is marked Captured or Reconstructed.
- Captured means the app stored the work items that were in the sprint when it started (this happens when a sprint starts while the app is installed). Removals after the start are still included in committed, which matches Jira's definition.
- Reconstructed means the sprint started before the app was installed, so there is no start snapshot. The app rebuilds the sprint from the work items it can still find and from their change history. Work items that were removed from the sprint before it closed cannot be found that way, so committed can be lower than in Jira's Velocity Chart. Completed is not affected, because a removed item is not completed in that sprint.
The panel only shows the Reconstructed explanation when at least one shown sprint is Reconstructed.
Private board filters
The history is built in the background with the app's own access, not with yours. If the board's filter is not shared with the app, the page does not keep trying to build. It shows this message, with Retry:
"Velocity History cannot read this board. The app builds the history in the background with its own access, and this board's filter is not shared with it. Ask the filter owner to share the filter with this project, then select Retry."
The page does not start a new build by itself for this reason. Share the filter with the project (or otherwise so the app can read it), then select Retry. You do not need to share the filter with every person who will look at the chart.
Settings
Settings is available to project admins and to Jira admins. Other users do not see the button. If someone without that permission reached the settings, the app would say: "Only project admins can change these settings."
You can set, per board:
- Count a work item as done when its status is one of a list of statuses. Leave the list empty to use the Done status category. The help text in the app is: "Leave empty to count work items in a status of the Done category. Jira's own chart counts the statuses in the board's last column, so choose those statuses here if the numbers differ."
- Default number of sprints (3 to 52). This is the number used when no number has been chosen on the page for that board.
Saving settings starts a rebuild for the board.
Known limitations
- 52 sprints is the maximum you can show. The page does not offer a date range or a sprint picker beyond that number.
- Closed sprints with no work items are left out, as in Jira's Velocity Chart. They do not take one of the 52 (or 12) slots.
- Totals can include work items you cannot open, for example because of issue security. The page shows only totals per sprint. It does not show work item keys or summaries. Report links go to Jira, which applies Jira permissions.
- Unmapped statuses. Work items in a status that is not mapped to any column on the board are left out of the app's totals. Jira's Velocity Chart may still count them in committed. They are also hidden on the board itself. This is uncommon, but it can make committed lower than in Jira's chart.
- Items added only a moment before the sprint starts. When a sprint starts, the app stores the work items that were in it. That list comes from a Jira search index, which can lag by a second or two. An item added immediately before the start can be missing from the snapshot. Items added well before the start are included. This is uncommon.
- On a team-managed board, the burndown link does not open a specific sprint. You pick the sprint in Jira.
- A board whose filter is not shared with the app cannot be built until the filter is shared, as described above.
- The selected board is not remembered after a reload. The chosen number of sprints is.
- There is no dashboard gadget, no download, no cross-project view and no per-person velocity. The app does not read assignees.
After you uninstall
The app writes nothing to your work items, so uninstalling leaves no app data on issues. Cached sprint totals and settings live in Forge hosted storage. According to Atlassian's Forge storage documentation, that data is deleted when you uninstall, and Atlassian may keep a soft-deleted copy for up to 28 days. It is not restored automatically if you install the app again.
Support
Email support@helkrypt.no, or use the form on this page.
If something goes wrong on the page, the app may say: "Something went wrong. Try again, or contact support@helkrypt.no."